Skip sizes and weights.
Volume gets you into the right ballpark. The included weight allowance decides what you actually pay. Here is both, with the honest caveat that skip names in South Africa are trade convention rather than a national standard.
The sizes
Mini skip
about 2–3 m³roughly 2–3 level bakkie loads
A single bathroom strip-out, a small garden clear, or clean rubble from a modest demolition. The usual choice for townhouse and tight-access jobs.
Watch: Small does not mean light. This is the size most often used for pure rubble precisely because the weight allowance runs out first.
Request a quote for a mini skip →Midi skip
about 4–6 m³roughly 4–6 level bakkie loads
A garage or spare-room clear-out, a kitchen strip-out, or a decent garden clearing. The most commonly hired domestic size.
Watch: Confirm whether the operator accepts mixed waste in this bin or wants a rubble-only load. Mixed loads cost more to dispose of.
Request a quote for a midi skip →Builders skip
about 6–9 m³roughly 6–9 level bakkie loads
Site rubble on an active build, multi-room renovation debris, larger household clearances and bulky garden loads.
Watch: Needs real truck access — length to reverse in and headroom to tip the bin off the back. Measure your gate before you book.
Request a quote for a builders skip →Maxi skip
about 10–12 m³roughly 10–12 level bakkie loads
Whole-house clearances, shopfitting and office strip-outs, and light-but-bulky construction waste.
Watch: A poor choice for dense rubble — you will hit the weight allowance at a fraction of the volume and pay an overload charge for the privilege.
Request a quote for a maxi skip →Roll-on / roll-off container
about 15 m³ and upnot a useful comparison at this size
Sustained construction and demolition programmes, industrial yards, and sites that need a container swapped on a cycle rather than hired once.
Watch: Placement is semi-permanent and the vehicle needs a lot of room. Usually quoted per swap plus disposal, so ask how the pricing is structured.
Request a quote for a roll-on / roll-off container →
Why weight beats volume
Operators are charged by mass at the weighbridge, so they price a weight allowance into the hire and bill anything above it. These indicative bulk densities are order-of- magnitude figures for reasoning about a load — they are not a substitute for the tonnage in your quote.
| Material | Indicative bulk density |
|---|---|
| Broken brick, block and concrete | ≈ 1.3–1.6 t per m³ |
| Sand, soil and excavation spoil | ≈ 1.4–1.8 t per m³ |
| Mixed renovation and strip-out waste | ≈ 0.3–0.6 t per m³ |
| Fresh garden refuse and cuttings | ≈ 0.15–0.3 t per m³ |
| General household and furniture waste | ≈ 0.1–0.2 t per m³ |
Skip size questions
- Is there a standard skip size in South Africa?
- No. Skip names are trade convention, not regulation, so a builders skip from one operator can be a different volume from the next. Always ask for the actual internal dimensions and the included weight allowance rather than relying on the name.
- Why does rubble need a smaller skip than household waste?
- Because it is roughly ten times denser. Broken brick and concrete run about 1.3 to 1.6 tonnes per cubic metre, while general household waste is closer to 0.1 to 0.2. A bin sized on volume for rubble will exceed the weight allowance long before it looks full, and the overload is charged to you.
- What does the weight allowance actually cover?
- The mass the operator has priced into the hire, based on what the receiving facility will charge them at the weighbridge. Ask for it in tonnes, and ask what each tonne over it costs. That one figure moves the final invoice more than the bin size does.
- Can I fill a skip above the rim?
- No. A load heaped over the rim cannot be lawfully or safely transported. The driver will either make you level it before lifting or leave without it. Cut long branches and dismantle furniture so material lies flat.
- How many bakkie loads is a skip?
- A level single-cab bakkie load is roughly a cubic metre, so a mini skip is about two to three loads, a midi four to six, and a builders skip six to nine. It is a rough conversion, but a useful one when you are describing a job over the phone.
Not sure which size?
Say so on the form. Describe the job in rooms, square metres or bakkie loads and the operator will size it against their own weight allowance — which is the number that matters.
Request a quote